When working on a multi-disciplinary project, what is the best way to deal with bid alternates? The biggest challenge relates to MEP systems in Revit. These systems allow us to properly calculate loads, such as electrical and CFM.

In this post I do a mockup of Design Options versus Phasing… neither are perfect.

Design Options:
The first image is the base bid plan view. The East wall and two receptacles are in the ‘base bid’ deign option (which is primary). Those two receptacles are properly connected to the panel which is not in a...
Read more »